Case Study 1: Koshi Riverbank Protection Project, Sunsari District (Eastern Nepal)

  • Client: Government of Nepal (Department of Water Resources and Irrigation - DoWRI)

  • Contractor: Nepalese Civil Engineering Consortium

  • Challenge: Severe erosion threatening farmland and settlements during monsoon floods. Needed rapid deployment of high-strength, flexible revetment.

  • Solution: Locally manufactured gabion boxes (80x100mm mesh, 2.7mm PVC-coated wire) produced using a Chinese double-twist gabion weaving machine.

  • Machine Role:

    • Supplied consistent, high-quality mesh at ~30 m²/hour.

    • Double take-up system enabled near-continuous production to meet tight pre-monsoon deadlines.

    • Handled voltage fluctuations (common in rural Sunsari) reliably with an external stabilizer.

    • Local operators trained by the Chinese supplier managed production efficiently.

  • Outcome: Successful installation of over 5km of gabion revetment before the monsoon. Significant reduction in erosion observed during subsequent floods. Project cost reduced by ~15% compared to importing finished gabions.

Case Study 2: Kathmandu Outer Ring Road Slope Stabilization

  • Client: Nepal Roads Authority (Department of Roads - DoR)

  • Contractor: International JV (with Nepali Sub-contractor)

  • Challenge: Stabilizing steep, unstable cut slopes along a new highway section near Kathmandu (approx. 1,400m ASL). Required durable, permeable facing.

  • Solution: Gabion retaining walls and mattresses (100x120mm mesh, 2.2mm Galfan wire) manufactured on-site.

  • Machine Role:

    • Chinese machine set up in a dedicated facility near the project site.

    • Produced mesh tailored to specific wall/mattress dimensions, minimizing waste.

    • PLC control ensured consistent mesh geometry crucial for structural integrity.

    • Withstood the dusty environment prevalent during road construction.

  • Outcome: Effective slope stabilization achieved. On-site manufacturing ensured just-in-time delivery, optimized logistics costs, and created local skilled jobs. The project demonstrated the viability of local gabion production for large infrastructure.

Case Study 3: Community-Based Micro-Hydropower Channel Protection, Rukum District (Western Nepal)

  • Client: Local Community Cooperative (NGO Supported)

  • Contractor: Local Construction Group

  • Challenge: Protecting intake channels and forebay structures of a small hydropower plant from debris flow and erosion in a remote, mountainous area. Limited budget and technical skills.

  • Solution: Small gabion structures (60x80mm mesh, 2.0mm PVC-coated wire) produced using a smaller, semi-automatic Chinese gabion machine.

  • Machine Role:

    • Lower power requirement suited to limited local generation capacity.

    • Simpler operation and maintenance manageable by locally trained technicians.

    • Portability allowed setup close to the project site, reducing transport costs for heavy wire spools.

    • Enabled community self-reliance for future maintenance gabions.

  • Outcome: Critical hydropower infrastructure protected affordably. Project empowered the local community with manufacturing capability for future resilience projects.

banner
Blog Details
Created with Pixso. Home Created with Pixso. Blog Created with Pixso.

Nepalese Market Construction Case Studies Using Chinese Gabion Machines

Nepalese Market Construction Case Studies Using Chinese Gabion Machines

Case Study 1: Koshi Riverbank Protection Project, Sunsari District (Eastern Nepal)

  • Client: Government of Nepal (Department of Water Resources and Irrigation - DoWRI)

  • Contractor: Nepalese Civil Engineering Consortium

  • Challenge: Severe erosion threatening farmland and settlements during monsoon floods. Needed rapid deployment of high-strength, flexible revetment.

  • Solution: Locally manufactured gabion boxes (80x100mm mesh, 2.7mm PVC-coated wire) produced using a Chinese double-twist gabion weaving machine.

  • Machine Role:

    • Supplied consistent, high-quality mesh at ~30 m²/hour.

    • Double take-up system enabled near-continuous production to meet tight pre-monsoon deadlines.

    • Handled voltage fluctuations (common in rural Sunsari) reliably with an external stabilizer.

    • Local operators trained by the Chinese supplier managed production efficiently.

  • Outcome: Successful installation of over 5km of gabion revetment before the monsoon. Significant reduction in erosion observed during subsequent floods. Project cost reduced by ~15% compared to importing finished gabions.

Case Study 2: Kathmandu Outer Ring Road Slope Stabilization

  • Client: Nepal Roads Authority (Department of Roads - DoR)

  • Contractor: International JV (with Nepali Sub-contractor)

  • Challenge: Stabilizing steep, unstable cut slopes along a new highway section near Kathmandu (approx. 1,400m ASL). Required durable, permeable facing.

  • Solution: Gabion retaining walls and mattresses (100x120mm mesh, 2.2mm Galfan wire) manufactured on-site.

  • Machine Role:

    • Chinese machine set up in a dedicated facility near the project site.

    • Produced mesh tailored to specific wall/mattress dimensions, minimizing waste.

    • PLC control ensured consistent mesh geometry crucial for structural integrity.

    • Withstood the dusty environment prevalent during road construction.

  • Outcome: Effective slope stabilization achieved. On-site manufacturing ensured just-in-time delivery, optimized logistics costs, and created local skilled jobs. The project demonstrated the viability of local gabion production for large infrastructure.

Case Study 3: Community-Based Micro-Hydropower Channel Protection, Rukum District (Western Nepal)

  • Client: Local Community Cooperative (NGO Supported)

  • Contractor: Local Construction Group

  • Challenge: Protecting intake channels and forebay structures of a small hydropower plant from debris flow and erosion in a remote, mountainous area. Limited budget and technical skills.

  • Solution: Small gabion structures (60x80mm mesh, 2.0mm PVC-coated wire) produced using a smaller, semi-automatic Chinese gabion machine.

  • Machine Role:

    • Lower power requirement suited to limited local generation capacity.

    • Simpler operation and maintenance manageable by locally trained technicians.

    • Portability allowed setup close to the project site, reducing transport costs for heavy wire spools.

    • Enabled community self-reliance for future maintenance gabions.

  • Outcome: Critical hydropower infrastructure protected affordably. Project empowered the local community with manufacturing capability for future resilience projects.